Foothill Transit Agency - Purchase of CNG Transit Buses

Contract Number
01016
MSRC Award
$2,640,000.00
Project Background

Foothill Transit purchased sixty six (66)Orion transit buses equipped with the Detroit Diesel Series 50G dedicated compressed natural gas (CNG) engine, certified by the California Air Resources Board at the Optional Low-NOx emissions level. These vehicles were purchased in lieu of diesel-fueled buses. Foothill Transit originally projected that each bus would operate approximately 42,000 mile per year within the jurisdication of the South Coast AQMD. During the course of the project, it was determined that each bus actually accrues approximately 55,000 miles per year.

Emission Tons CO Annual
0.00
Emission Tons CO Total
0.00
Emission Tons NOX Annual
0.00
Emission Tons PM Annual
0.00
Emission Tons PM Total
0.00
Emission Tons Rog Annual
0.00
Emission Tons Rog Total
0.00
Project Cost Description

22141152.00

Project Implementation

All areas within the South Coast region benefit from reductions in ozone precursor emissions and diesel exhaust particulate.

Project Results Description

The estimated emission reductions attributable to the 66 CNG buses are as follows: Oxides of Nitrogen (NOx): 68,762 pounds reduced per year Particulate Matter (PM10): 1,032 pounds per year

Project Status Description

The Final Report includes: Abstract Summary & Conclusions Foothill Transit Fleet Facts Quarterly Reports Fleet Management Reports

Project Year
2001
Summary Approved
No
Total Project Cost
$22,141,200.00
Co Funding Amount
$0.00
Project Category
Contractor Address
100 North Barranca Avenue
Contractor Agency
Foothill Transit Agency
Contractor City
West Covina
Contractor Contact
George Karbowski
Contractor Country
United States of America
Contractor State
CA
Contractor Phone
Contractor ID
1016
Contractor Zip
91791
Co Participants
Participants in this project include Federal Transit Administration, Orion Bus Industries, Detroit Diesel Corporation, and the South Coast AQMD.
Final Approval Date
Final Report Approved
No
Start Date
End Date