75 CNG Buses, Fueling Station

Contract Number
MS04007
MSRC Award
$715,000.00
Project Background

Foothill Transit Agency currently operates 232 compressed natural gas (CNG) urban transit buses, 170 at its Pomona Operation and Maintenance Facility and 62 at its Arcadia/Irwindale location. An additional 82 diesel buses located in Arcadia/Irwindale will be replaced by CNG buses within the next five years. Foothill Transit operates CNG refueling stations at both bus facilities, including a public access station at the Pomona Facility. The Pomona facility is now 100% CNG; no diesel fuel infrastructure remains at this facility.

Emission Tons CO Annual
0.00
Emission Tons CO Total
0.00
Emission Tons NOX Annual
23.09
Emission Tons PM Annual
0.53
Emission Tons PM Total
0.00
Emission Tons Rog Annual
0.00
Emission Tons Rog Total
0.00
Project Cost Description

29515000.00

Project Implementation

Foothill Transit selected the North American Bus Industries 40-foot urban transit bus equipped with the Detroit Diesel Series 50G natrual gas engine for purchase. This urban transit bus engine is certified by the California Air Resources Board at a NOx plus non-methane hydrocarbon rating of 1.2 g/bhp-hr, which is approximately one-half the emissions of a comparable hevy-duty diesel engine. Twenty-two of the buses were deployed at the Arcadia/Irwindale facility; 53 buses were assigned to the Pomona facility. Foothill Transit also constructed a new CNG refueling station at its Arcadia facility to accomodate the new CNG buses.

Project Objectives

The objective of this project was to continue Foothill Transit's transition to CNG buses through: a) the purchase of 75 new CNG transit buses; b)construction of a CNG refueling station; c) maintenance garage expansion and station methane detection system upgrades at the Irwindale/Arcadia facility; and d) fleet mechanic training for maintenance of CNG buses.

Project Results Description

All buses are currently operating in revenue service, and the Arcadia CNG refueling station is fully operational. No technical issues have been identified by Foothill Transit.

Project State
California
Project Status Description

All 75 CNG buses have been received, undergone acceptance testing, and have been placed into revenue service. Construction of the Arcadia CNG station is complete and operational. In addition, the training of fleet mechanics, installation of methane detection, and maintenance facility modifications are all complete.

Project Year
2004
Summary Approved
No
Total Project Cost
$29,515,000.00
Co Funding Amount
$28,800,000.00
Project Category
Contractor Address
100 North Barranca, Ste. 100
Contractor Agency
Foothill Transit Agency
Contractor City
West Covina
Contractor Contact
George Karbowski
Contractor Country
United States of America
Contractor State
CA
Contractor Phone
Contractor ID
0
Contractor Zip
91791
Co Participants
Federal Transit Administration
North American Bus Industries
Detroit Diesel Corporation
Clean Energy
Final Approval Date
Final Report Approved
No